Industrial Energy Management & Power Monitoring Systems

Integrate meters, equipment, and production logs to organize peak/off-peak power, energy costs, and anomaly states into actionable operational management information.

Use CasesPeak/off-peak cost analysis, contract demand monitoring & cross-plant reporting
Data SourcesDigital power meters, machine logs, CSVs & utility electricity bills
DeploymentPlant intranet servers, secure gateway uploads, or private clouds
PoC Baseline1-2 representative circuits and 2-4 weeks of historical consumption logs

Putting energy data into daily decisions: applicable problems and constraints

Helping manufacturing and energy-intensive facilities establish searchable, analytical energy governance starting from disparate meters, machines, and operational records.

TARGET PROBLEMS

Target Problems

Rising peak-hour power costs, penalties from contract demand overruns, fragmented data across multiple plants, and error-prone manual Excel compiling.

REQUIRED INPUTS

Required Inputs

Main switchboard and sub-circuit meter readings (or export files), utility tariff schedules and contract demand caps, plus major line scheduling information.

CONSTRAINTS

Adoption Constraints

Traditional mechanical meters without digital output require retrofitting with digital meters or current transformers (CTs); measurement units must be standardized.

On-premises, controlled network, and cloud evaluation criteria

We provide three primary deployment topologies tailored to factory network isolation rules and management structures:

ON-PREMISES

Plant On-Premises

If plant security forbids production or energy data from accessing the public web, the software can run entirely on local Linux/Windows servers via internal LAN.

CONTROLLED NETWORK

Controlled Network Transport

When headquarters requires aggregate figures across multiple locations, secure edge services push encrypted summary data over unidirectional channels (HTTPS/TLS).

PRIVATE CLOUD

Private Cloud & Controlled SaaS

Support containerized deployment in private enterprise clouds or virtual private clouds (VPCs), with strict role-based views and export boundaries.

Small-scale PoC: inputs, deliverables, and acceptance criteria

We first validate data accuracy and report usability in a single machine room or key circuit before broader plant rollout:

Required Inputs

Provide 2-4 weeks of historical consumption data (CSV/Excel) for 1-2 representative circuits alongside utility bills from the corresponding period.

Deliverables

Deliver peak/off-peak cost breakdown reports, mathematical logic documentation, and an interactive prototype dashboard.

Acceptance Criteria

Cross-validate total calculated kWh, peak demand, and estimated tariffs against actual utility statements, confirming discrepancies remain within agreed margins.

Maintenance responsibilities and cost drivers

RESPONSIBILITY

Division of Responsibilities

Physical meters, CTs, and factory network infrastructure are managed by plant IT; Wejia maintains data pipelines, tariff algorithms, database storage, and dashboard portals.

COST & TIMELINE

Cost & Timeline Factors

Determined by the variety of meter protocols (Modbus RTU/TCP, MQTT, or DB queries), complexity of time-of-use tariff schedules, and multi-site access hierarchies.

Corresponding Case Studies & Related Services

Energy Management FAQ

Our factory has partial digital meters and manual Excel logs. Can they be directly integrated?
Yes. We first audit existing meter protocols (such as Modbus RTU/TCP) and Excel report columns, merging automated collection with historical records into a unified calculation rule set and database to avoid redundant infrastructure expenses.
Can the energy management system be deployed on a factory intranet without internet access?
Yes. The system supports full on-premises deployment on plant Linux or Windows servers. Personnel can access peak/off-peak metrics and reports via standard internal browsers without transmitting data to public clouds.
How do we verify that system-calculated power consumption and utility fees are accurate?
During the small-scale PoC phase, we cross-check 2 to 4 weeks of meter readings against actual utility bills to verify that peak, half-peak, off-peak allocations and contract demand calculations match before proceeding to full rollout.

Start with one set of real data

Clarify data formats and calculation rules first, then establish dashboards and reports.

Start Discussion